Standard glossary of terms used in Software Testing
compiled by Erik van Veenendaal. This document presents concepts, terms
and definitions designed to aid communication in (software) testing and related
disciplines.
A
acceptance criteria: The exit criteria that a component or system must
satisfy in order to be accepted by a user, customer, or other authorized
entity. [IEEE 610]
acceptance testing: Formal testing with respect to user needs,
requirements, and business processes conducted to determine whether or not a
system satisfies the acceptance criteria and to enable the user, customers or
other authorized entity to determine whether or not to accept the system.
[After IEEE 610]
accessibility testing: Testing to determine the ease by which users with
disabilities can use a component or system. [Gerrard]
accuracy: The capability of the software product to provide
the right or agreed results or effects with the needed degree of precision.
[ISO 9126] See also functionality testing.
actual result: The behavior produced/observed when a component or
system is tested.
ad hoc testing: Testing carried out informally; no formal test
preparation takes place, no recognized test design technique is used, there are
no expectations for results and randomness guides the test execution activity.
adaptability: The capability of the software product to be
adapted for different specified environments without applying actions or means
other than those provided for this purpose for the software considered. [ISO
9126] See also portability testing.
agile testing: Testing practice for a project using agile
methodologies, such as extreme programming (XP), treating development as the
customer of testing and emphasizing the test-first design paradigm.
alpha testing: Simulated or actual operational testing by
potential users/customers or an independent test team at the developers’ site,
but outside the development organization. Alpha testing is often employed as a
form of internal acceptance testing.
analyzability: The capability of the software product to be
diagnosed for deficiencies or causes of failures in the software, or for the
parts to be modified to be identified. [ISO 9126] See also maintainability
testing.
anomaly: Any condition that deviates from expectation based
on requirements specifications, design documents, user documents, standards,
etc. or from someone’s perception or experience. Anomalies may be found during,
but not limited to, reviewing, testing, analysis, compilation, or use of
software products or applicable documentation. [IEEE 1044] See also defect,
deviation, error, fault, failure, incident, problem.
attractiveness: The capability of the software product to be
attractive to the user. [ISO 9126]
audit: An independent evaluation of software products or
processes to ascertain compliance to standards, guidelines, specifications,
and/or procedures based on objective criteria, including documents that
specify:
(1) the form or content of the products
to be produced
(2) the process by which the products
shall be produced
(3) how compliance to standards or
guidelines shall be measured. [IEEE 1028]
audit trail: A path by which the original input to a process
(e.g. data) can be traced back through the process, taking the process output
as a starting point. This facilitates defect analysis and allows a process
audit to be carried out. [After TMap]
automated testware: Testware used in automated testing, such as tool
scripts.
availability: The degree to which a component or system is
operational and accessible when required for use. Often expressed as a
percentage. [IEEE 610]
B
back-to-back testing: Testing in which two or more variants of a
component or system are executed with the same inputs, the outputs compared,
and analyzed in cases of discrepancies. [IEEE 610]
baseline: A specification or software product that has been
formally reviewed or agreed upon, that thereafter serves as the basis for
further development, and that can be changed only through a formal change
control process. [After IEEE 610]
basic block: A sequence of one or more consecutive executable
statements containing no branches.
basis test set: A set of test cases derived from the internal
structure or specification to ensure that 100% of a specified coverage
criterion is achieved.
behavior: The response of a component or system to a set of
input values and preconditions.
benchmark test: (1) A standard against which measurements or
comparisons can be made. (2) A test that is be used to compare components or
systems to each other or to a standard as in (1). [After IEEE 610]
bespoke software: Software developed specifically for a set of users
or customers. The opposite is off-the-shelf software.
best practice: A superior method or innovative practice that
contributes to the improved performance of an organization under given context,
usually recognized as ‘best’ by other peer organizations.
beta testing: Operational testing by potential and/or existing
users/customers at an external site not otherwise involved with the developers,
to determine whether or not a component or system satisfies the user/customer
needs and fits within the business processes. Beta testing is often employed as
a form of external acceptance testing in order to acquired feedback from the
market.
big-bang testing: A type of integration testing in which software
elements, hardware elements, or both are combined all at once into a component
or an overall system, rather than in stages. [After IEEE 610] See also
integration testing.
black box testing: Testing, either functional or non-functional,
without reference to the internal structure of the component or system.
black box test design techniques: Documented procedure to derive and select test
cases based on an analysis of the specification, either functional or
non-functional, of a component or system without reference to its internal
structure.
blocked test case: A test case that cannot be executed because the
preconditions for its execution are not fulfilled.
bottom-up testing: An incremental approach to integration testing
where the lowest level components are tested first, and then used to facilitate
the testing of higher level components. This process is repeated until the
component at the top of the hierarchy is tested. See also integration testing.
boundary value: An input value or output value which is on the edge
of an equivalence partition or at the smallest incremental distance on either
side of an edge, for example the minimum or maximum value of a range.
boundary value analysis: A black box test design technique in which test
cases are designed based on boundary values.
boundary value coverage: The percentage of boundary values that have been
exercised by a test suite.
branch: A basic block that can be selected for execution
based on a program construct in which one of two or more alternative program
paths are available, e.g. case, jump, go to, ifthen- else.
branch coverage: The percentage of branches that have been exercised
by a test suite. 100% branch coverage implies both 100% decision coverage and
100% statement coverage.
branch testing: A white box test design technique in which test
cases are designed to execute branches.
business process-based testing: An approach to testing in which test cases are
designed based on descriptions and/or knowledge of business processes.
C
Capability Maturity Model (CMM): A five level staged framework that describes the
key elements of an effective software process. The Capability Maturity Model
covers practices for planning, engineering and managing software development
and maintenance. [CMM]
Capability Maturity Model Integration
(CMMI): A framework that describes the key
elements of an effective product development and maintenance process. The
Capability Maturity Model Integration covers practices for planning,
engineering and managing product development and maintenance. CMMI is the
designated successor of the CMM. [CMMI]
capture/playback tool: A type of test execution tool where inputs are
recorded during manual testing in order to generate automated test scripts that
can be executed later (i.e. replayed). These tools are often used to support
automated regression testing.
CASE: Acronym for Computer Aided Software Engineering.
CAST: Acronym for Computer Aided Software Testing. See
also test automation.
cause-effect graph: A graphical representation of inputs and/or stimuli
(causes) with their associated outputs (effects), which can be used to design
test cases.
cause-effect graphing: A black box test design technique in which test
cases are designed from cause-effect graphs. [BS 7925/2]
certification: The process of confirming that a component, system
or person complies with its specified requirements, e.g. by passing an exam.
changeability: The capability of the software product to enable
specified modifications to be implemented. [ISO 9126] See also maintainability.
classification tree method: A black box test design technique in which test
cases, described by means of a classification tree, are designed to execute
combinations of representatives of input and/or output domains. [Grochtmann]
code coverage: An analysis method that determines which parts of
the software have been executed (covered) by the test suite and which parts
have not been executed, e.g. statement coverage, decision coverage or condition
coverage.
co-existence: The capability of the software product to co-exist
with other independent software in a common environment sharing common
resources. [ISO 9126] See portability testing.
complexity: The degree to which a component or system has a
design and/or internal structure that is difficult to understand, maintain and
verify. See also cyclomatic complexity.
compliance: The capability of the software product to adhere to
standards, conventions or regulations in laws and similar prescriptions. [ISO
9126]
compliance testing: The process of testing to determine the compliance
of component or system.
component: A minimal software item that can be tested in
isolation.
component integration testing: Testing performed to expose defects in the
interfaces and interaction between integrated components.
component specification: A description of a component’s function in terms of
its output values for specified input values under specified conditions, and
required non-functional behavior (e.g. resource-utilization).
component testing: The testing of individual software components.
[After IEEE 610]
compound condition: Two or more single conditions joined by means of a
logical operator (AND, OR or XOR), e.g. ‘A>B AND C>1000’.
concurrency testing: Testing to determine how the occurrence of two or
more activities within the same interval of time, achieved either by
interleaving the activities or by simultaneous execution, is handled by the
component or system. [After IEEE 610]
condition: A logical expression that can be evaluated as True
or False, e.g. A>B. See also test condition.
condition coverage: The percentage of condition outcomes that have been
exercised by a test suite. 100% condition coverage requires each single
condition in every decision statement to be tested as True and False.
condition determination coverage: The percentage of all single condition outcomes
that independently affect a decision outcome that have been exercised by a test
case suite. 100% condition determination coverage implies 100% decision
condition coverage.
condition determination testing: A white box test design technique in which test
cases are designed to execute single condition outcomes that independently
affect a decision outcome.
condition testing: A white box test design technique in which test
cases are designed to execute condition outcomes.
condition outcome: The evaluation of a condition to True or False.
configuration: The composition of a component or system as defined
by the number, nature, and interconnections of its constituent parts.
configuration auditing: The function to check on the contents of libraries
of configuration items, e.g. for standards compliance. [IEEE 610]
configuration control: An element of configuration management, consisting
of the evaluation, co-ordination, approval or disapproval, and implementation
of changes to configuration items after formal establishment of their
configuration identification. [IEEE
610]
configuration identification: An element of configuration management, consisting
of selecting the configuration items for a system and recording their functional
and physical characteristics in technical documentation. [IEEE 610]
configuration item: An aggregation of hardware, software or both, that
is designated for configuration management and treated as a single entity in
the configuration management process. [IEEE 610]
configuration management: A discipline applying technical and administrative
direction and surveillance to: identify and document the functional and
physical characteristics of a configuration item, control changes to those
characteristics, record and report change processing and implementation status,
and verify compliance with specified requirements. [IEEE 610]
consistency: The degree of uniformity, standardization, and
freedom from contradiction among the documents or parts of a component or
system. [IEEE 610]
control flow: An abstract representation of all possible
sequences of events (paths) in the execution through a component or system.
conversion testing: Testing of software used to convert data from
existing systems for use in replacement systems.
COTS: Acronym for Commercial Off-The-Shelf software.
coverage: The degree, expressed as a percentage, to which a
specified coverage item has been exercised by a test suite.
coverage analysis: Measurement of achieved coverage to a specified
coverage item during test execution referring to predetermined criteria to
determine whether additional testing is required and if so, which test cases
are needed.
coverage item: An entity or property used as a basis for test
coverage, e.g. equivalence partitions or code statements.
coverage tool: A tool that provides objective measures of what
structural elements, e.g. statements, branches have been exercised by the test
suite.
cyclomatic complexity: The number of independent paths through a program.
Cyclomatic complexity is defined as: L – N + 2P, where – L = the number of
edges/links in a graph – N = the number of nodes in a graph – P = the
number of disconnected parts of the graph (e.g. a calling graph and a
subroutine). [After McCabe]
D
data definition: An executable statement where a variable is
assigned a value.
data driven testing: A scripting technique that stores test input and
expected results in a table or spreadsheet, so that a single control script can
execute all of the tests in the table. Data driven testing is often used to
support the application of test execution tools such as capture/playback tools.
[Fewster and Graham] See also keyword driven testing.
data flow: An abstract representation of the sequence and
possible changes of the state of data objects, where the state of an object is
any of: creation,
usage, or destruction. [Beizer]
data flow analysis: A form of static analysis based on the definition
and usage of variables.
data flow coverage: The percentage of definition-use pairs that have
been exercised by a test case suite.
data flow test: A white box test design technique in which test
cases are designed to execute definition and use pairs of variables.
debugging: The process of finding, analyzing and removing the
causes of failures in software.
debugging tool: A tool used by programmers to reproduce failures,
investigate the state of programs and find the corresponding defect. Debuggers
enable programmers to execute programs step by step, to halt a program at any
program statement and to set and examine program variables.
decision: A program point at which the control flow has two
or more alternative routes. A node with two or more links to separate branches.
decision condition coverage: The percentage of all condition outcomes and
decision outcomes that have been exercised by a test suite. 100% decision
condition coverage implies both 100% condition coverage and 100% decision
coverage.
decision condition testing: A white box test design technique in which test
cases are designed to execute condition outcomes and decision outcomes.
decision coverage: The percentage of decision outcomes that have been
exercised by a test suite. 100% decision coverage implies both 100% branch
coverage and 100% statement coverage.
decision table: A table showing combinations of inputs and/or
stimuli (causes) with their associated outputs and/or actions (effects), which
can be used to design test cases.
decision table testing: A black box test design techniques in which test
cases are designed to execute the combinations of inputs and/or stimuli
(causes) shown in a decision table. [Veenendaal]
decision testing: A white box test design technique in which test
cases are designed to execute decision outcomes.
decision outcome: The result of a decision (which therefore
determines the branches to be taken).
defect: A flaw in a component or system that can cause the
component or system to fail to perform its required function, e.g. an incorrect
statement or data definition. A defect, if encountered during execution, may
cause a failure of the component or system.
defect density: The number of defects identified in a component or
system divided by the size of the component or system (expressed in standard
measurement terms, e.g. lines-ofcode, number of classes or function points).
Defect Detection Percentage (DDP): the number of defects found by a test phase,
divided by the number found by that test phase and any other means afterwards.
defect report: A document reporting on any flaw in a component or
system that can cause the component or system to fail to perform its required
function. [After IEEE 829]
defect management: The process of recognizing, investigating, taking
action and disposing of defects. It involves recording defects, classifying
them and identifying the impact. [After IEEE 1044]
defect masking: An occurrence in which one defect prevents the
detection of another. [After IEEE 610]
definition-use pair: The association of the definition of a variable
with the use of that variable. Variable uses include computational (e.g.
multiplication) or to direct the execution of a path (“predicate” use).
deliverable: Any (work) product that must be delivered to
someone other that the (work) product’s author.
design-based testing: An approach to testing in which test cases are
designed based on the architecture and/or detailed design of a component or
system (e.g. tests of interfaces between components or systems).
desk checking: Testing of software or specification by manual
simulation of its execution.
development testing: Formal or informal testing conducted during the
implementation of a component or system, usually in the development environment
by developers. [After IEEE 610]
documentation testing: Testing the quality of the documentation, e.g. user
guide or installation guide.
domain: The set from which valid input and/or output values
can be selected.
driver: A software component or test tool that replaces a
component that takes care of the control and/or the calling of a component or
system. [After TMap]
dynamic analysis: The process of evaluating behavior, e.g. memory
performance, CPU usage, of a system or component during execution. [After IEEE
610]
dynamic comparison: Comparison of actual and expected results,
performed while the software is being executed, for example by a test execution
tool.
dynamic testing: Testing that involves the execution of the software
of a component or system.
E
efficiency: The capability of the software product to provide
appropriate performance, relative to the amount of resources used under stated
conditions. [ISO 9126]
efficiency testing: The process of testing to determine the efficiency
of a software product.
elementary comparison testing: A black box test design techniques in which test
cases are designed to execute combinations of inputs using the concept of
condition determination coverage. [TMap]
emulator: A device, computer program, or system that accepts
the same inputs and produces the same outputs as a given system. [IEEE 610] See
also simulator.
entry criteria: the set of generic and specific conditions for
permitting a process to go forward with a defined task, e.g. test phase. The
purpose of entry criteria is to prevent a task from starting which would entail
more (wasted) effort compared to the effort needed to remove the failed entry
criteria. [Gilb and Graham]
entry point: The first executable statement within a component.
equivalence partition: A portion of an input or output domain for which
the behavior of a component or system is assumed to be the same, based on the
specification.
equivalence partition coverage: The percentage of equivalence partitions that have
been exercised by a test suite.
equivalence partitioning: A black box test design technique in which test
cases are designed to execute representatives from equivalence partitions. In
principle test cases are designed to cover each partition at least once.
error: A human action that produces an incorrect result.
[After IEEE 610]
error guessing: A test design technique where the experience of the
tester is used to anticipate what defects might be present in the component or
system under test as a result of errors made, and to design tests specifically
to expose them.
error seeding: The process of intentionally adding known defects
to those already in the component or system for the purpose of monitoring the
rate of detection and removal, and estimating the number of remaining defects.
[IEEE 610]
error tolerance: The ability of a system or component to continue
normal operation despite the presence of erroneous inputs. [After IEEE 610].
exception handling: Behavior of a component or system in response to
erroneous input, from either a human user or from another component or system,
or to an internal failure.
executable statement: A statement which, when compiled, is translated
into object code, and which will be executed procedurally when the program is
running and may perform an action on data.
exercised: A program element is said to be exercised by a test
case when the input value causes the execution of that element, such as a
statement, decision, or other structural element.
exhaustive testing: A test approach in which the test suite comprises
all combinations of input values and preconditions.
exit criteria: The set of generic and specific conditions, agreed
upon with the stakeholders, for permitting a process to be officially
completed. The purpose of exit criteria is to prevent a task from being
considered completed when there are still outstanding parts of the task which
have not been finished. Exit criteria are used by testing to report against and
to plan when to stop testing. [After Gilb and Graham]
exit point: The last executable statement within a component.
expected result: The behavior predicted by the specification, or
another source, of the component or system under specified conditions.
exploratory testing: Testing where the tester actively controls the
design of the tests as those tests are performed and uses information gained
while testing to design new and better tests. [Bach]
F
fail: A test is deemed to fail if its actual result does
not match its expected result.
failure: Actual deviation of the component or system from
its expected delivery, service or result. [After Fenton]
failure mode: The physical or functional manifestation of a
failure. For example, a system in failure mode may be characterized by slow
operation, incorrect outputs, or complete termination of execution.
Failure Mode and Effect Analysis
(FMEA): A systematic approach to risk
identification and analysis of identifying possible modes of failure and
attempting to prevent their occurrence.
failure rate: The ratio of the number of failures of a given
category to a given unit of measure, e.g. failures per unit of time, failures
per number of transactions, failures per number of computer runs. [IEEE 610]
fault tolerance: The capability of the software product to maintain
a specified level of performance in cases of software faults (defects) or of
infringement of its specified interface. [ISO 9126] See also reliability.
fault tree analysis: A method used to analyze the causes of faults
(defects).
feasible path: A path for which a set of input values and
preconditions exists which causes it to be executed.
feature: An attribute of a component or system specified or
implied by requirements documentation (for example reliability, usability or
design constraints). [After IEEE 1008]
finite state machine: A computational model consisting of a finite number
of states and transitions between those states, possibly with accompanying
actions. [IEEE 610]
formal review: A review characterized by documented procedures and
requirements, e.g. inspection.
frozen test basis: A test basis document that can only be amended by a
formal change control process. See also baseline.
Function Point Analysis (FPA): Method aiming to measure the size of the
functionality of an information system. The measurement is independent of the
technology. This measurement may be used as a basis for the measurement of
productivity, the estimation of the needed resources, and project control.
functional integration: An integration approach that combines the
components or systems for the purpose of getting a basic functionality working
early. See also integration testing.
functional requirement: A requirement that specifies a function that a
component or system must perform. [IEEE 610]
functional test design technique: Documented procedure to derive and select test
cases based on an analysis of the specification of the functionality of a
component or system without reference to its internal structure. See also black
box test design technique.
functional testing: Testing based on an analysis of the specification
of the functionality of a component or system. See also black box testing.
functionality: The capability of the software product to provide
functions which meet stated and implied needs when the software is used under
specified conditions. [ISO 9126]
functionality testing: The process of testing to determine the
functionality of a software product.
G
glass box testing: See white box testing.
H
heuristic evaluation: A static usability test technique to determine the
compliance of a user interface with recognized usability principles (the
so-called “heuristics”).
high level test case: A test case without concrete (implementation level)
values for input data and expected results.
horizontal traceability: The tracing of requirements for a test level
through the layers of test documentation (e.g. test plan, test design
specification, test case specification and test procedure specification).
I
impact analysis: The assessment of change to the layers of
development documentation, test documentation and components, in order to
implement a given change to specified requirements.
incremental development model: A development life cycle where a project is broken
into a series of increments, each of which delivers a portion of the
functionality in the overal project requirements. The requirements are
prioritized and delivered in priority order in the appropriate increment. In
some (but not all) versions of this life cycle model, each subproject follows a
‘mini V-model’ with its own design, coding and testing phases.
incremental testing: Testing where components or systems are integrated
and tested one or some at a time, until all the components or systems are
integrated and tested.
incident: Any event occurring during testing that requires
investigation. [After IEEE 1008]
incident management: The process of recognizing, investigating, taking
action and disposing of incidents. It involves recording incidents, classifying
them and identifying the impact. [After IEEE 1044]
incident management tool: A tool that facilitates the recording and status
tracking of incidents found during testing. They often have workflow-oriented
facilities to track and control the allocation, correction and re-testing of
incidents and provide reporting facilities.
incident report: A document reporting on any event that occurs
during the testing which requires investigation. [After IEEE 829]
independence: Separation of responsibilities, which encourages
the accomplishment of objective testing. [After DO-178b]
infeasible path: A path that cannot be exercised by any set of
possible input values.
informal review: A review not based on a formal (documented)
procedure.
input: A variable (whether stored within a component or
outside) that is read by a component.
input domain: The set from which valid input values can be
selected.. See also domain.
input value: An instance of an input. See also input.
inspection: A type of review that relies on visual examination
of documents to detect defects, e.g. violations of development standards and
non-conformance to higher level documentation. The most formal review technique
and therefore always based on a documented procedure. [After IEEE 610, IEEE
1028]
installability: The capability of the software product to be
installed in a specified environment [ISO 9126]. See also portability.
installability testing: The process of testing the installability of a
software product. See also portability testing.
installation guide: Supplied instructions on any suitable media, which
guides the installer through the installation process. This may be a manual
guide, step-by-step procedure, installation wizard, or any other similar
process description.
installation wizard: Supplied software on any suitable media, which
leads the installer through the installation process. It normally runs the
installation process, provides feedback on installation results, and prompts
for options.
instrumentation: The insertion of additional code into the program
in order to collect information about program behavior during execution.
instrumenter: A software tool used to carry out instrumentation.
intake test: A special instance of a smoke test to decide if the
component or system is ready for detailed and further testing. An intake test
is typically carried out at the start of the test execution phase.
integration: The process of combining components or systems into
larger assemblies.
integration testing: Testing performed to expose defects in the
interfaces and in the interactions between integrated components or systems.
See also component integration testing, system integration testing.
interface testing: An integration test type that is concerned with
testing the interfaces between components or systems.
interoperability: The capability of the software product to interact
with one or more specified components or systems. [After ISO 9126] See also
functionality.
interoperability testing: The process of testing to determine the
interoperability of a software product. See also functionality testing.
invalid testing: Testing using input values that should be rejected
by the component or system. See also error tolerance.
isolation testing: Testing of individual components in isolation from
surrounding components, with surrounding components being simulated by stubs
and drivers, if needed.
K
keyword driven testing: A scripting technique that uses data files to contain
not only test data and expected results, but also keywords related to the
application being tested. The keywords are interpreted by special supporting
scripts that are called by the control script for the test. See also data
driven testing.
L
LCSAJ: A Linear Code Sequence And Jump, consisting of the
following three items (conventionally identified by line numbers in a source
code listing): the start of the linear sequence of executable statements, the
end of the linear sequence, and the target line to which control flow is
transferred at the end of the linear sequence.
LCSAJ coverage: The percentage of LCSAJs of a component that have
been exercised by a test suite. 100% LCSAJ coverage implies 100% decision
coverage.
LCSAJ testing: A white box test design technique in which test
cases are designed to execute LCSAJs.
learnability: The capability of the software product to enable
the user to learn its application. [ISO 9126] See also usability.
load test: A test type concerned with measuring the behavior of
a component or system with increasing load, e.g. number of parallel users
and/or numbers of transactions to determine what load can be handled by the
component or system.
low level test case: A test case with concrete (implementation level)
values for input data and expected results.
M
maintenance: Modification of a software product after delivery
to correct defects, to improve performance or other attributes, or to adapt the
product to a modified environment. [IEEE 1219]
maintenance testing: Testing the changes to an operational system or the
impact of a changed environment to an operational system.
maintainability: The ease with which a software product can be
modified to correct defects, modified to meet new requirements, modified to
make future maintenance easier, or adapted to a changed environment. [ISO 9126]
maintainability testing: The process of testing to determine the
maintainability of a software product.
management review: A systematic evaluation of software acquisition,
supply, development, operation, or maintenance process, performed by or on
behalf of management that monitors progress, determines the status of plans and
schedules, confirms requirements and heir system allocation, or evaluates the
effectiveness of management approaches to achieve fitness for purpose. [After
IEEE 610, IEEE 1028]
maturity: (1) The capability of an organization with respect
to the effectiveness and efficiency of its processes and work practices. See
also Capability Maturity Model, Test Maturity Model. (2) The capability of the
software product to avoid failure as a result of defects in the software. [ISO
9126] See also reliability.
measure: The number or category assigned to an attribute of
an entity by making a measurement [ISO 14598].
measurement: The process of assigning a number or category to an
entity to describe an attribute of that entity. [ISO 14598]
measurement scale: A scale that constrains the type of data analysis
that can be performed on it. [ISO 14598]
memory leak: A defect in a program’s dynamic store allocation
logic that causes it to fail to reclaim memory after it has finished using it,
eventually causing the program to fail due to lack of memory.
metric: A measurement scale and the method used for
measurement. [ISO 14598]
milestone: A point in time in a project at which defined
(intermediate) deliverables and results should be ready.
moderator: The leader and main person responsible for an
inspection or other review process.
monitor: A software tool or hardware device that run
concurrently with the component or system under test and supervises, records
and/or analyses the behavior of the component or system. [After IEEE 610]
multiple condition coverage: The percentage of combinations of all single
condition outcomes within one statement that have been exercised by a test
suite. 100% multiple condition coverage implies 100% condition
determination coverage.
multiple condition testing: A white box test design technique in which test
cases are designed to execute combinations of single condition outcomes (within
one statement).
mutation analysis: A method to determine test suite thoroughness by
measuring the extent to which a test suite can discriminate the program from
slight variants (mutants) of the program.
N
N-switch coverage: The percentage of sequences of N+1 transitions that
have been exercised by a test suite. [Chow]
N-switch testing: A form of state transition testing in which test
cases are designed to execute all valid sequences of N+1 transitions. [Chow]
See also state transition testing.
negative testing: Tests aimed at showing that a component or system
does not work. Negative testing is related to the testers’ attitude rather than
a specific test approach or test design technique. [After Beizer].
non-conformity: Non fulfillment of a specified requirement. [ISO
9000]
non-functional requirement: A requirement that does not relate to
functionality, but to attributes of such as reliability, efficiency, usability,
maintainability and portability.
non-functional testing: Testing the attributes of a component or system
that do not relate to functionality, e.g. reliability, efficiency, usability,
maintainability and portability.
non-functional test design techniques: Methods used to design or select tests for
nonfunctional testing.
O
off-the-shelf software: A software product that is developed for the
general market, i.e. for a large number of customers, and that is delivered to
many customers in identical format.
operability: The capability of the software product to enable
the user to operate and control it. [ISO 9126] See also usability.
operational environment: Hardware and software products installed at users’
or customers’ sites where the component or system under test will be used. The
software may include operating systems, database management systems, and other
applications.
operational profile testing: Statistical testing using a model of system
operations (short duration tasks) and their probability of typical use. [Musa]
operational testing: Testing conducted to evaluate a component or system
in its operational environment. [IEEE 610]
output: A variable (whether stored within a component or
outside) that is written by a component.
output domain: The set from which valid output values can be
selected. See also domain.
output value: An instance of an output. See also output.
P
pair programming: A software development approach whereby lines of
code (production and/or test) of a component are written by two programmers
sitting at a single computer. This implicitly means ongoing real-time code
reviews are performed.
pair testing: Two testers work together to find defects.
Typically, they share one computer and trade control of it while testing.
Pass: A test is deemed to pass if its actual result
matches its expected result.
pass/fail criteria: Decision rules used to determine whether a test
item (function) or feature has passed or failed a test. [IEEE 829]
path: A sequence of events, e.g. executable statements,
of a component or system from an entry point to an exit point.
path coverage: The percentage of paths that have been exercised by
a test suite. 100% path coverage implies 100% LCSAJ coverage.
path sensitizing: Choosing a set of input values to force the
execution of a given path.
path testing: A white box test design technique in which test
cases are designed to execute paths.
performance: The degree to which a system or component
accomplishes its designated functions within given constraints regarding
processing time and throughput rate. [After IEEE 610] See efficiency.
performance indicator: A high level metric of effectiveness and/or
efficiency used to guide and control progressive development, e.g. Defect
Detection Percentage (DDP) for testing. [CMMI]
performance testing: The process of testing to determine the performance
of a software product. See efficiency testing.
performance testing tool: A tool to support performance testing and that
usually has two main facilities: load generation and test transaction
measurement. Load generation can simulate either multiple users or high volumes
of input data. During execution, response time measurements are taken from
selected transactions and these are logged. Performance testing tools normally
provide reports based on test logs and graphs of load against response times.
phase test plan: A test plan that typically addresses one test
level.
portability: The ease with which the software product can be
transferred from one hardware or software environment to another. [ISO 9126]
portability testing: The process of testing to determine the portability
of a software product.
postcondition: Environmental and state conditions that must be
fulfilled after the execution of a test or test procedure.
post-execution comparison: Comparison of actual and expected results,
performed after the software has finished running.
precondition: Environmental and state conditions that must be
fulfilled before the component or system can be executed with a particular test
or test procedure.
Priority: The level of (business) importance assigned to an
item, e.g. defect.
process cycle test: A black box test design technique in which test
cases are designed toexecute business procedures and processes. [TMap]
process: A set of interrelated activities, which transform
inputs into outputs. [ISO 12207]
project: A project is a unique set of coordinated and
controlled activities with start and finish dates undertaken an objective
conforming to specific requirements, including the constraints of time, cost
and resources. [ISO 9000]
project test plan: A test plan that typically addresses multiple test
levels.
pseudo-random: A series which appears to be random but is in fact
generated according to some prearranged sequence.
Q
quality: The degree to which a component, system or process
meets specified requirements and/or user/customer needs and expectations.
[After IEEE 610]
quality assurance: Part of quality management focused on providing
confidence that quality requirements will be fulfilled. [ISO 9000]
quality attribute: A feature or characteristic that affects an item’s
quality. [IEEE 610]
quality management: Coordinated activities to direct and control an
organization with regard to quality. Direction and control with regard to
quality generally includes the establishment of the quality policy and quality
objectives, quality planning, quality control, quality assurance and quality
improvement. [ISO 9000]
R
random testing: A black box test design technique where test cases
are selected, possibly using a pseudo-random generation algorithm, to match an
operational profile. This technique can be used for testing non-functional
attributes such as reliability and performance.
recoverability: The capability of the software product to
re-establish a specified level of performance and recover the data directly
affected in case of failure. [ISO 9126] See also reliability.
recoverability testing: The process of testing to determine the
recoverability of a software product. See also reliability testing.
regression testing: Testing of a previously tested program following
modification to ensure that defects have not been introduced or uncovered in
unchanged areas of the software, as a result of the changes made. It is
performed when the software or its environment is changed.
release note: A document identifying test items, their
configuration, current status and other delivery information delivered by
development to testing, and possibly other stakeholders, at the start of a test
execution phase. [After IEEE 829]
reliability: The ability of the software product to perform its
required functions under stated conditions for a specified period of time, or
for a specified number of operations. [ISO 9126]
reliability testing: The process of testing to determine the reliability
of a software product.
replaceability: The capability of the software product to be used
in place of another specified software product for the same purpose in the same
environment. [ISO 9126] See also portability.
requirement: A condition or capability needed by a user to solve
a problem or achieve an objective that must be met or possessed by a system or
system component to satisfy a contract, standard, specification, or other
formally imposed document. [After IEEE 610]
requirements-based testing: An approach to testing in which test cases are
designed based on test objectives and test conditions derived from
requirements, e.g. tests that exercise specific functions or probe
non-functional attributes such as reliability or usability.
requirements management tool: A tool that supports the recording of requirements,
requirements attributes (e.g. priority, knowledge responsible) and annotation,
and facilitates traceability through layers of requirements and requirements
change management. Some requirements management tools also provide facilities
for static analysis, such as consistency checking and violations to pre-defined
requirements rules.
requirements phase: The period of time in the software life cycle
during which the equirements for a software product are defined and documented.
[IEEE 610]
resource utilization: The capability of the software product to use
appropriate amounts and types of resources, for example the amounts of main and
secondary memory used by the program and the sizes of required temporary or
overflow files, when the software performs its function under stated
conditions. [After ISO 9126] See also efficiency.
resource utilization testing: The process of testing to determine the
resource-utilization of a software product.
result: The consequence/outcome of the execution of a test.
It includes outputs to screens, changes to data, reports, and communication
messages sent out. See also actual result, expected result.
resumption criteria: The testing activities that must be repeated when
testing is re-started after a suspension. [After IEEE 829]
re-testing: Testing that runs test cases that failed the last
time they were run, in order to verify the success of corrective actions.
review: An evaluation of a product or project status to
ascertain discrepancies from planned results and to recommend improvements.
Examples include management review, informal review, technical review,
inspection, and walkthrough. [After IEEE 1028]
reviewer: The person involved in the review who shall
identify and describe anomalies in the product or project under review.
Reviewers can be chosen to represent different viewpoints and roles in the
review process.
risk: A factor that could result in future negative
consequences; usually expressed as impact and likelihood.
risk analysis: The process of assessing identified risks to
estimate their impact and probability of occurrence (likelihood).
risk-based testing: Testing oriented towards exploring and providing
information about product risks. [After Gerrard]
risk control: The process through which decisions are reached and
protective measures are implemented for reducing risks to, or maintaining risks
within, specified levels.
risk identification: The process of identifying risks using techniques
such as brainstorming, checklists and failure history.
risk management: Systematic application of procedures and practices
to the tasks of identifying, analyzing, prioritizing, and controlling risk.
robustness: The degree to which a component or system can
function correctly in the presence of invalid inputs or stressful environmental
conditions. [IEEE 610] See also errortolerance, fault-tolerance.
root cause: An underlying factor that caused a non-conformance
and possibly should be permanently eliminated through process improvement.
S
safety: The capability of the software product to achieve
acceptable levels of risk of harm to people, business, software, property or
the environment in a specified context of use. [ISO 9126]
safety testing: The process of testing to determine the safety of a
software product.
scalability: The capability of the software product to be
upgraded to accommodate increased loads. [After Gerrard]
scalability testing: Testing to determine the scalability of the
software product.
scribe: The person who has to record each defect mentioned
and any suggestions for improvement during a review meeting, on a logging form.
The scribe has to make ensure that the logging form is readable and
understandable.
scripting language: A programming language in which executable test
scripts are written, used by a test execution tool (e.g. a capture/replay
tool).
security: Attributes of software products that bear on its
ability to prevent unauthorized access, whether accidental or deliberate, to
programs and data. [ISO 9126]
security testing: Testing to determine the security of the software
product.
severity: The degree of impact that a defect has on the
development or operation of a component or system. [After IEEE 610]
simulation: The representation of selected behavioral
characteristics of one physical or abstract system by another system. [ISO
2382/1]
simulator: A device, computer program or system used during
testing, which behaves or operates like a given system when provided with a set
of controlled inputs. [After IEEE 610, DO178b] See also emulator.
smoke test: A subset of all defined/planned test cases that
cover the main functionality of a component or system, to ascertaining that the
most crucial functions of a program work, but not bothering with finer details.
A daily build and smoke test is among industry best practices. See also intake
test.
software quality: The totality of functionality and features of a
software product that bear on its ability to satisfy stated or implied needs.
[After ISO 9126]
specification: A document that specifies, ideally in a complete,
precise and verifiable manner, the requirements, design, behavior, or other
characteristics of a component or system, and, often, the procedures for
determining whether these provisions have been satisfied. [After IEEE 610]
specification-based test design
technique: See black box test design technique.
specified input: An input for which the specification predicts a
result.
stability: The capability of the software product to avoid
unexpected effects from modifications in the software. [ISO 9126] See also
maintainability.
state diagram: A diagram that depicts the states that a component
or system can assume, and shows the events or circumstances that cause and/or
result from a change from one state to another. [IEEE 610]
state table: A grid showing the resulting transitions for each
state combined with each possible event, showing both valid and invalid
transitions.
state transition: A transition between two states of a component or
system.
state transition testing: A black box test design technique in which test
cases are designed to execute valid and invalid state transitions. See also
N-switch testing.
statement: An entity in a programming language, which is
typically the smallest indivisible unit of execution.
statement coverage: The percentage of executable statements that have
been exercised by a test suite.
statement testing: A white box test design technique in which test
cases are designed to execute statements.
static analysis: Analysis of software artifacts, e.g. requirements
or code, carried out without execution of these software artifacts.
static analyzer: A tool that carries out static analysis.
static code analysis: Analysis of program source code carried out without
execution of that software.
static code analyzer: A tool that carries out static code analysis. The
tool checks source code, for certain properties such as conformance to coding
standards, quality metrics or data flow anomalies.
static testing: Testing of a component or system at specification
or implementation level without execution of that software, e.g. reviews or
static code analysis.
statistical testing: A test design technique in which a model of the
statistical distribution of the input is used to construct representative test
cases. See also operational profile testing.
status accounting: An element of configuration management, consisting
of the recording and reporting of information needed to manage a configuration
effectively. This information includes a listing of the approved configuration
identification, the status of proposed changes to the configuration, and the
implementation status of the approved changes. [IEEE 610]
Stress testing: Testing conducted to evaluate a system or component
at or beyond the limits of its specified requirements. [IEEE 610]
structural coverage: Coverage measures based on the internal structure
of the component.
structural test design technique: See white box test design technique.
stub: A skeletal or special-purpose implementation of a
software component, used to develop or test a component that calls or is
otherwise dependent on it. It replaces a called component. [After IEEE 610]
subpath: A sequence of executable statements within a
component.
suspension criteria: The criteria used to (temporarily) stop all or a
portion of the testing activities on the test items. [After IEEE 829]
suitability: The capability of the software product to provide
an appropriate set of functions for specified tasks and user objectives. [ISO
9126] See also functionality.
Software Usability Measurement
Inventory (SUMI): A questionnaire based
usability test technique to evaluate the usability, e.g. user-satisfaction, of
a component or system. [Veenendaal]
syntax testing: A black box test design technique in which test
cases are designed based upon the definition of the input domain and/or output
domain.
system: A collection of components organized to accomplish
a specific function or set of functions. [IEEE 610]
system integration testing: Testing the integration of systems and packages;
testing interfaces to external organizations (e.g. Electronic Data Interchange,
Internet).
system testing: The process of testing an integrated system to
verify that it meets specified requirements. [Hetzel]
T
technical review: A peer group discussion activity that focuses on
achieving consensus on the technical approach to be taken. A technical review
is also known as a peer review. [Gilb and Graham, IEEE 1028]
test approach: The implementation of the test strategy for a
specific project. It typically includes the decisions made that follow based on
the (test) project’s goal and the risk assessment carried out, starting points
regarding the test process, the test design techniques to be applied, exit
criteria and test types to be performed.
test automation: The use of software to perform or support test
activities, e.g. test management, test design, test execution and results
checking.
test basis: All documents from which the requirements of a
component or system can be inferred. The documentation on which the test cases
are based. If a document can be amended only by way of formal amendment
procedure, then the test basis is called a frozen test basis. [After TMap]
test case: A set of input values, execution preconditions,
expected results and execution post conditions, developed for a particular
objective or test condition, such as to exercise a particular program path or
to verify compliance with a specific requirement. [After IEEE 610]
test case specification: A document specifying a set of test cases
(objective, inputs, test actions, expected results, and execution
preconditions) for a test item. [After IEEE 829]
test charter: A statement of test objectives, and possibly test
ideas. Test charters are amongst other used in exploratory testing. See also
exploratory testing.
test comparator: A test tool to perform automated test comparison.
test comparison: The process of identifying differences between the
actual results produced by the component or system under test and the expected
results for a test. Test comparison can be performed during test execution
(dynamic comparison) or after test execution.
test condition: An item or event of a component or system that
could be verified by one or more test cases, e.g. a function, transaction,
quality attribute, or structural element.
test data: Data that exists (for example, in a database)
before a test is executed, and that affects or is affected by the component or
system under test.
test data preparation tool: A type of test tool that enables data to be
selected from existing databases or created, generated, manipulated and edited
for use in testing.
test design specification: A document specifying the test conditions (coverage
items) for a test item, the detailed test approach and identifying the
associated high level test cases. [After IEEE 829]
test design tool: A tool that support the test design activity by
generating test inputs from a specification that may be held in a CASE tool
repository, e.g. requirements management tool, or from specified test
conditions held in the tool itself.
test design technique: A method used to derive or select test cases.
test environment: An environment containing hardware,
instrumentation, simulators, software tools, and other support elements needed
to conduct a test. [After IEEE 610]
test evaluation report: A document produced at the end of the test process
summarizing all testing activities and results. It also contains an evaluation
of the test process and lessons learned.
test execution: The process of running a test by the component or
system under test, producing actual result(s).
test execution automation: The use of software, e.g. capture/playback tools,
to control the execution of tests, the comparison of actual results to expected
results, the setting up of test preconditions, and other test control and
reporting functions.
test execution phase: The period of time in a software development life
cycle during which the components of a software product are executed, and the
software product is evaluated to determine whether or not requirements have
been satisfied. [IEEE 610]
test execution schedule: A scheme for the execution of test procedures. The
test procedures are included in the test execution schedule in their context
and in the order in which they are to be executed.
test execution technique: The method used to perform the actual test
execution, either
manually or automated.
test execution tool: A type of test tool that is able to execute other
software using an automated test script, e.g. capture/playback. [Fewster and
Graham]
test harness: A test environment comprised of stubs and drivers
needed to conduct a test.
test infrastructure: The organizational artifacts needed to perform
testing, consisting of test environments, test tools, office environment and
procedures.
test item: The individual element to be tested. There usually
is one test object and many test items. See also test object.
test level: A group of test activities that are organized and
managed together. A test level is linked to the responsibilities in a project.
Examples of test levels are component test, integration test, system test and
acceptance test. [After TMap]
test log: A chronological record of relevant details about
the execution of tests. [IEEE 829]
test logging: The process of recording information about tests
executed into a test log.
test manager: The person responsible for testing and evaluating a
test object. The individual, who directs, controls, administers plans and
regulates the evaluation of a test object.
test management: The planning, estimating, monitoring and control of
test activities, typically carried out by a test manager.
Test Maturity Model (TMM): A five level staged framework for test process
improvement, related to the Capability Maturity Model (CMM) that describes the
key elements of an effective test process.
Test Process Improvement (TPI): A continuous framework for test process improvement
that describes the key elements of an effective test process, especially
targeted at system testing and acceptance testing.
test object: The component or system to be tested. See also test
item.
test objective: A reason or purpose for designing and executing a
test.
test oracle: A source to determine expected results to compare
with the actual result of the software under test. An oracle may be the
existing system (for a benchmark), a user manual, or an individual’s
specialized knowledge, but should not be the code. [After Adrion]
test performance indicator: A metric, in general high level, indicating to what
extent a certain target value or criterion is met. Often related to test
process improvement objectives, e.g. Defect Detection Percentage (DDP).
test phase: A distinct set of test activities collected into a
manageable phase of a project, e.g. the execution activities of a test level.
[After Gerrard]
test plan: A document describing the scope, approach,
resources and schedule of intended test activities. It identifies amongst
others test items, the features to be tested, the testing tasks, who will do
each task, degree of tester independence, the test environment, the test design
techniques and test measurement techniques to be used, and the rationale for
their choice, and any risks requiring contingency planning. It is a record of
the test planning process [After IEEE 829]
test planning: The activity of establishing or updating a test
plan.
test policy: A high level document describing the principles,
approach and major objectives of the organization regarding testing.
test point analysis (TPA): A formula based test estimation method based on function
point analysis. [TMap]
test procedure: See test procedure specification.
test procedure specification: A document specifying a sequence of actions for the
execution of a test. Also known as test script or manual test script. [After
IEEE 829]
test process: The fundamental test process comprises planning,
specification, execution, recording and checking for completion. [BS 7925/2]
test repeatability: An attribute of a test indicating whether the same
results are produced each time the test is executed.
test run: Execution of a test on a specific version of the
test object.
test script: Commonly used to refer to a test procedure
specification, especially an automated one.
test specification: A document that consists of a test design
specification, test case specification and/or test procedure specification.
test strategy: A high-level document defining the test levels to
be performed and the testing within those levels for a programme (one or more
projects).
test suite: A set of several test cases for a component or
system under test, where the post condition of one test is often used as the
precondition for the next one.
test summary report: A document summarizing testing activities and
results. It also contains an evaluation of the corresponding test items against
exit criteria. [After
IEEE 829]
test target: A set of exit criteria.
test tool: A software product that supports one or more test
activities, such as planning and control, specification, building initial files
and data, test execution and test analysis. [TMap] See also CAST.
test type: A group of test activities aimed at testing a
component or system regarding one or more interrelated quality attributes. A
test type is focused on a specific test objective, i.e. reliability test,
usability test, regression test etc., and may take place on one or more test
levels or test phases. [After TMap]
testability: The capability of the software product to enable
modified software to be tested. [ISO 9126] See also maintainability.
testability review: A detailed check of the test basis to determine
whether the test basis is at an adequate quality level to act as an input
document for the test process. [After TMap]
testable requirements: The degree to which a requirement is stated in
terms that permit establishment of test designs (and subsequently test cases)
and execution of tests to determine whether the requirements have been met.
[After IEEE 610]
tester: A technically skilled professional who is involved
in the testing of a component or system.
testing: The process consisting of all life cycle
activities, both static and dynamic, concerned with planning, preparation and
evaluation of software products and related work products to determine that
they satisfy specified requirements, to demonstrate that they are fit for
purpose and to detect defects.
testware: Artifacts produced during the test process required
to plan, design, and execute tests, such as documentation, scripts, inputs,
expected results, set-up and clear-up procedures, files, databases, environment,
and any additional software or utilities used in testing. [After Fewster and
Graham]
thread testing: A version of component integration testing where
the progressive integration of components follows the implementation of subsets
of the requirements, as opposed to the integration of components by levels of a
hierarchy.
traceability: The ability to identify related items in
documentation and software, such as requirements with associated tests.
See also horizontal traceability, vertical traceability.
top-down testing: An incremental approach to integration testing
where the component at the top of the component hierarchy is tested first, with
lower level components being simulated by stubs. Tested components are then
used to test lower level components. The process is repeated until the lowest
level components have been tested.
U
understandability: The capability of the software product to enable
the user to understand whether the software is suitable, and how it can be used
for particular tasks and conditions of use. [ISO 9126] See also usability.
unreachable code: Code that cannot be reached and therefore is
impossible to execute.
usability: The capability of the software to be understood,
learned, used and attractive to the user when used under specified conditions.
[ISO 9126]
usability testing: Testing to determine the extent to which the
software product is understood, easy to learn, easy to operate and attractive
to the users under specified conditions. [After ISO 9126]
use case testing: A black box test design technique in which test
cases are designed to execute user scenarios.
user test: A test whereby real-life users are involved to
evaluate the usability of a component or system.
V
V-model: A framework to describe the software development
life cycle activities from requirements specification to maintenance. The
V-model illustrates how testing activities can be integrated into each phase of
the software development life cycle.
validation: Confirmation by examination and through provision
of objective evidence that the requirements for a specific intended use or
application have been fulfilled. [ISO 9000]
variable: An element of storage in a computer that is
accessible by a software program by referring to it by a name.
verification: Confirmation by examination and through the
provision of objective evidence that specified requirements have been
fulfilled. [ISO 9000]
vertical traceability: The tracing of requirements through the layers of
development documentation to components.
volume testing: Testing where the system is subjected to large
volumes of data. See also resource-utilization testing.
W
walkthrough: A step-by-step presentation by the author of a
document in order to gather information and to establish a common understanding
of its content. [Freedman and Weinberg, IEEE 1028]
white box test design technique: Documented procedure to derive and select test
cases based on an analysis of the internal structure of a component or system.
white box testing: Testing based on an analysis of the internal
structure of the component or system.
Wide Band Delphi: An expert based test estimation technique that aims
at making an accurate estimation using the collective wisdom of the team
members.
No comments:
Post a Comment